Service

Construction time-lapse

I put a camera in a weatherproof housing on your site and it photographs the build from the empty plot to the finished building. Months or years of work then become a 15–⁠30 second video in which the building rises before your eyes.

At a glance

On site
months to years
Resolution
source frames 24 MP, final video 4K
Maintenance
regular on-site servicing, done by me
Completed
more than 10 long-term time-lapses for various companies

01 How it works

Day after day, winter and summer

The camera stays on site the whole time and takes a picture at the interval I set, whether it rains, freezes or bakes. It captures the excavation, the foundations, every new floor and the first lit windows. I then turn all the frames into a video in which months of construction fit into half a minute.

Construction time-lapse simulation On the site, a building rises floor by floor, a crane turns, day and night and the seasons pass, and a camera in a weatherproof housing takes a picture at the set interval. After 23 months, about 700 days, the frames become a video of 15 to 30 seconds.
A simulation, not footage. The 23 months of construction, about 700 days, shrink to 15–⁠30 seconds of video: roughly 2 to 4 million times faster. The numbers come from the Technical Development building time-lapse below; each tick on the upper bar is a month.

02 Client work

The Technical Development building: 23 months of building in half a minute

I have filmed more than 10 long-term construction time-lapses for various companies. One of them follows the Škoda Auto Technical Development building from the foundations to completion: the camera started shooting when only the foundations and the first columns were in place, and stopped at the finished building, 73 × 73 m in footprint and 26 m high.

The building in numbers

  • 23months of construction, about 700 days
  • 73 × 73m building footprint
  • 26m building height
Play video: Construction of Škoda Auto’s Technical Development building in one video
Construction of Škoda Auto’s Technical Development building in one video Clicking loads the video from YouTube (Google).

03 A record of the build

When something collapses, the frames show why

The camera sees the site from the same spot every day, and every frame records when it was taken. If something on site comes loose or collapses, the frames let you trace back what came before it and in what order. The record can show how one operation on site led to another, which would otherwise remain guesswork.

Illustrative example

  1. DAY 212 · 08:10

    An excavator starts digging a trench for a utility connection, about 4 m from the floodlight mast.

  2. DAY 212 · 11:40

    The trench is deep and stays open. The mast is still standing straight.

  3. DAY 212 · 16:50

    A crack has opened by the mast footing and the soil is sliding towards the trench.

  4. DAY 213 · 06:30

    The mast is down. Without the record, nobody could say when or why it fell.

What the frames showed

  1. Trench about 4 m from the footing
  2. Disturbed ground
  3. Crack by the footing
  4. Mast falls

An illustrative example, not a real incident.

04 Equipment

A camera rig built to stay on site for months

I shoot time-lapses with a high-quality Nikon camera. On site, though, it has to spend months or years outdoors through rain, frost, summer heat and humidity, so I keep it in a weatherproof housing that shields it from the weather.

Inside the housing the camera works on its own: at the interval I set, it takes a picture day after day, whatever the weather. Your build gets a silent witness that records its every step.

Weatherproof housing for long-term time-lapse: a grey box with a camera, protective glass in front of the lens, raindrops on the housing.
Water beads on the housing while the camera stays dry inside, looking out through protective glass.

05 Resolution

Sharper than 4K straight from a camera

I don’t shoot time-lapses with a conventional 4K video camera but with a Nikon camera and excellent Nikon lenses. Every frame has 24 megapixels, about 6000 × 4000 px. That is roughly three times as many pixels as a 4K video frame (3840 × 2160 px, or 8.3 MP).

So the final 4K video is made from a much larger image, which makes it far sharper than 4K recorded straight by a video camera, such as a CCTV security camera.

There is room to spare in every frame, too: it is 2160 px wider and 1840 px taller than a 4K image. I can crop the shot in post-production or pan slowly across it, and the video stays in full 4K.

≈ 6000 px ≈ 4000 px Nikon 24 MP 4K 8.3 MP Full HD 2.1 MP ≈ 2.9× the pixels of 4K
Nikon frame
24 MP about 6000 × 4000 px
4K video
8.3 MP 3840 × 2160 px
Full HD
2.1 MP 1920 × 1080 px
Frames to scale: the Nikon camera, 4K video and Full HD, the resolution many security cameras record in.

24 MP 25 × 25 px

4K 16 × 16 px

Full HD 8 × 8 px

The same detail, different pixel countsA small part of the shot, a crane jib with its cable and hook, at the same field of view. A 24 MP frame gives it 25 × 25 px, 4K 16 × 16 px and Full HD just 8 × 8 px, where the lattice and the thin cable merge into grey squares.

06 Combined

Camera on the ground and drone

The camera on the ground photographs the build from one spot, start to finish. A drone time-lapse flyover shows it from above: I fly exactly the same route over the site each time and blend the flights into one. The two work well together: the camera on the ground shoots every day and the drone comes in at the key stages of the build.

07 Questions

Frequently asked questions

How long will the final video be?

Usually 15–⁠30 seconds. We agree the length based on where it will be shown: on a website, in a presentation or at the building’s opening.

How long can the camera stay on site?

Months to years. Long time-lapses are my speciality, but I also film things that take just a few days.

How often does it take a picture?

As often as your project needs. I set the interval to suit the length of the build and what the video should show.

Does someone have to visit the site for maintenance?

Yes, the camera needs regular servicing. I do it myself and schedule it so that it doesn’t get in the way of work on site. You don’t have to look after anything, just give me access.

When should I get in touch?

Before the excavators arrive. The empty plot, the “before” shot, can only be filmed once.

What will it cost?

It depends on the build, the schedule and the location. Once I know them, I’ll send you a price and terms.

Visualisation: the anthracite ribbon of the sundial with gold edges and cut-out numbers winds at a slant above the light paving of a new square; a woman and a man talk beside it, with residential buildings, a tree and people behind.

For developers

A sundial for new public squares

Is a new square part of your development? A polar sundial gives it a landmark and a meeting place. Light and a cable’s shadow show the time, calculated for your site.

Planning a build?

Tell me what you are building, where, and when work starts. I’ll get back to you as soon as I can.